Wednesday 19 September 2018
Contact US    |    Archive
premiumtimesng
2 months ago

Third Mainland Bridge to be shut from July 27

The repair works on the bridge would be staggered over a period of 27 months. The post Third Mainland Bridge to be shut from July 27 appeared first on Premium Times Nigeria.

Read on the original site


هذه الصفحة هي مجرد قاریء تلقائي للأخبار باستخدام خدمة الـ RSS و بأن نشر هذه الأخبار هنا لاتعني تأییدها علی الإطلاق.

The Face of Change?

- nigeria70

Expect a new beginning

- vanguardngr

Healing wings (2)

- nigeria70

Healing wings (2)

- vanguardngr

Okonkwo, others for Superfest

- thenationonlineng

JOYCE 08140948440

- sunnewsonline
Hashtags:   

Third

 | 

Mainland

 | 

Bridge

 | 

shut

 | 

from

 | 

July

 | 
Most Popular (6 hours)

A thought for Lagos

- sunnewsonline

Most Popular (24 hours)

Most Popular (a week)